Rapid response after a failure

After an unexpected clarifier failure, a site needed clarification restored within days to avoid a discharge violation.

Sector

Industrial

Response

Within days

Solution

PSR Rental

Path

Rental → permanent

Representative project profile based on typical R+F plate settler deployments. Figures illustrate typical performance ranges rather than a single named client.

The Challenge

A sudden mechanical failure took the site clarifier out of service. Without solids removal, the plant faced an imminent breach of its discharge consent.

The operator needed treatment capacity restored in the shortest possible time, with a path to a permanent solution afterwards.

The R+F Solution

R+F mobilised a rental plate settler within days to restore solids removal and protect compliance. Polymer dosing was added to handle the incoming solids load.

With treatment stabilised, the operator used the rental period to specify and procure a permanent stainless steel plate settler, converting the emergency response into a planned upgrade.

Results

Days

Response

Avoided

Violation

Rent → buy

Path

Permanent fix

Outcome