Rental Deployment
Rental

Rental Deployment

Bridging a plant outage

A plant needed temporary clarification while its main clarifier was taken offline for refurbishment.

Sector

Municipal

Duration

~3 months

Solution

PSR Rental

Path

Rental

Representative project profile based on typical R+F plate settler deployments. Figures illustrate typical performance ranges rather than a single named client.

The Challenge

A scheduled refurbishment required the main clarifier to be taken out of service. The plant still had to treat incoming flow and meet its discharge consent throughout the outage.

A permanent purchase was unnecessary; the operator needed reliable temporary capacity for the duration of the works.

The R+F Solution

R+F supplied a rental PSR plate settler, delivered and commissioned ahead of the shutdown. It carried the clarification duty while the main unit was offline.

The compact rental unit maintained effluent quality within consent for the full refurbishment period and was demobilised once the main clarifier returned to service.

Results

Maintained

Compliance

Covered

Downtime

Rental

Commercial

Fast

Commissioning