
Increase Clarifier Capacity
Up to 300% More Capacity Without New Tanks
When your plant needs more capacity but space and budget are limited, plate settler retrofit is the most cost-effective path to significantly increased treatment capacity.
How It Works
By installing inclined plate settler modules inside your existing tank, you multiply the effective settling area without changing the tank\'s footprint. A conventional clarifier operating at 0.5–1.0 m/h can be upgraded to 1.5–3.5 m/h — a 2–3x capacity increase using the same physical infrastructure.
No New Civil Works
Use your existing tanks and infrastructure. No foundation, no excavation, no new concrete.
Rapid Implementation
From survey to commissioning in weeks, not months. Minimize disruption to operations.
Cost-Effective
Retrofit typically costs 20–40% of equivalent new-build capacity. Protect your existing investment.
Need More Capacity?
Our engineers will review your application, flow rates, and water quality data to recommend the optimal plate settler configuration.