Existing Tank Retrofit
Install Plate Settlers in Your Current Infrastructure
Convert your existing sedimentation tank, concrete basin, or steel tank into a high-rate plate settler system. No new construction needed.
The Retrofit Process
R+F engineers survey your existing tank, design custom plate settler modules to fit, and install them with minimal modification to the existing structure.
Site Assessment
Detailed survey of your existing tank dimensions, condition, inlet/outlet configuration, and current performance.
Engineering Design
Custom plate settler module design optimized for your tank geometry, flow rates, and treatment objectives.
Fabrication
Plate packs and support structures manufactured in stainless steel to precise specifications.
Installation
Professional installation during a planned shutdown. Typically completed in 1–3 weeks depending on scope.
Commissioning
System startup, performance testing, and operator training to ensure optimal operation.
Related Pages
Ready to Retrofit?
Our engineers will review your application, flow rates, and water quality data to recommend the optimal plate settler configuration.