Existing Tank Retrofit
Retrofit

Existing Tank Retrofit

Install Plate Settlers in Your Current Infrastructure

Convert your existing sedimentation tank, concrete basin, or steel tank into a high-rate plate settler system. No new construction needed.

The Retrofit Process

R+F engineers survey your existing tank, design custom plate settler modules to fit, and install them with minimal modification to the existing structure.

01

Site Assessment

Detailed survey of your existing tank dimensions, condition, inlet/outlet configuration, and current performance.

02

Engineering Design

Custom plate settler module design optimized for your tank geometry, flow rates, and treatment objectives.

03

Fabrication

Plate packs and support structures manufactured in stainless steel to precise specifications.

04

Installation

Professional installation during a planned shutdown. Typically completed in 1–3 weeks depending on scope.

05

Commissioning

System startup, performance testing, and operator training to ensure optimal operation.

Ready to Retrofit?

Our engineers will review your application, flow rates, and water quality data to recommend the optimal plate settler configuration.