
Construction Site Water Treatment
Dewatering & Suspended Solids Removal
Mobile plate settler systems for construction dewatering, turbidity control, and suspended solids removal on active construction sites.
Compliant Discharge from Construction Sites
Construction activities generate turbid water from excavation dewatering, concrete washout, and surface runoff. Regulatory discharge limits for TSS and turbidity require effective treatment before release to surface waters or municipal sewers.
Excavation Dewatering
Treat groundwater pumped during foundation and utility excavation to meet discharge standards.
Stormwater Runoff
Treat turbid surface runoff from active construction areas before discharge.
Tunnel Construction
Continuous treatment of tunnel boring and shaft construction water.
Concrete Washout
pH adjustment and solids removal from concrete washout water.
Related Pages
Need Construction Site Treatment?
Our engineers will review your application, flow rates, and water quality data to recommend the optimal plate settler configuration.