Mining & Minerals
Mining

Mining & Minerals

Process water clarification & reuse

A mineral processing operation needed to clarify process water for reuse and reduce the load on its tailings pond.

Sector

Mineral processing

Flow

~300 m³/h

Solution

PSH High-Rate

Path

New installation

Representative project profile based on typical R+F plate settler deployments. Figures illustrate typical performance ranges rather than a single named client.

The Challenge

Process water carried a high load of fine mineral solids. Relying only on the tailings pond limited water recovery and required a large settling area.

The operator wanted to recover clarified water for reuse in the process and thicken solids ahead of tailings management.

The R+F Solution

R+F supplied high-rate plate settlers with flocculant dosing to aggregate the fine mineral particles. The large projected settling area handled the high flow in a compact steel unit.

Clarified overflow was returned to the process, while thickened underflow was routed to tailings, reducing pond load and improving water recovery.

Results

High

Water recovery

>90%

Solids capture

Reduced

Pond load

~300 m³/h

Flow handled

Have a similar challenge?