Construction Dewatering
Construction

Construction Dewatering

Silty runoff & tunnelling water

A construction and tunnelling project needed to treat silty groundwater and site runoff to meet discharge turbidity limits.

Sector

Construction

Flow

~60 m³/h

Solution

PSR Rental

Path

Rental

Representative project profile based on typical R+F plate settler deployments. Figures illustrate typical performance ranges rather than a single named client.

The Challenge

Dewatering and tunnelling generated large volumes of silty water that exceeded turbidity limits for discharge to surface water. The need was temporary, for the duration of the project.

Buying permanent equipment was not justified, and the site required fast mobilisation with minimal setup.

The R+F Solution

R+F deployed a rental PSR plate settler with polymer dosing to aggregate the fine silt. The skid-mounted unit was mobilised quickly and commissioned on site.

Clarified water met discharge turbidity limits; settled silt was collected for disposal. At project end the unit was demobilised and returned.

Results

Within limits

Turbidity

Rapid

Mobilisation

Rental

Commercial

~60 m³/h

Flow